Product Details:
Payment & Shipping Terms:
|
Dimensions: | 9500*1000*1500mm | ||
---|---|---|---|
High Light: | z purlin roll forming machine,roll former machine |
CE Certificated 380v CZ Purlin Roll Frorming Machine with PCL Control System
Industrial Process And Component Specification
No |
|
Technical Specification |
1 |
Manual Uncoiler |
Usage:It is used to support the steel coil and uncoil it in a turnable way The steel coil is uncoiled by hand. Loading capacity:1.2T, Inner diameter: 500-508mm |
2 |
Feeding Table |
Put the raw material(steel plate) through the beach to manufacture and process It can guarantee that the products are neat Parallel and everything is uniformity Please refer to the equipment regulation to know the function of locate angle iron. |
3 |
Main Roll Forming Machine |
Material of rollers:45# steel,roller surfaces polishing, hard plating The polished surface and the heat treatment towards the molds also can keep the molding Plate surface smooth and not easy to be marked when it is being stamped |
4 |
Hydraulic System Computer Control Cabinet |
Power:4kw,Hydraulic oil: 40# Hydraulic oil into the hydraulic oil tank ,the pump drive the cutter machine to begin the cutting job. The target piece`s length is adjustable and digit of it can be adjusted Computed mode has two modes: automatic and manual one The system is easy to operate and use PLC:EURA |
5 |
Shearing Mechanism |
It adopts the hydraulic drive and automatic location to decide the dimension and cut the target products. Material of blades: Cr12,quenching treatment |
6 |
Output Table |
It adopts welded steel and supported roller to transmit the products,which is used to collect the finished products. |
1.We have professional technicians for loading
Guaranteed the goods load into container without any damage.
2.Transportation : Machines need one 40 feet container to hold.
1.Warranty
One year,and we will provide technical support for wholelife of the equipment.
2.Installation And Charge
Purchaser pays all charges during period of install to overseas,
(include charges of food,lodging and round trip air tickets ,etc.)
Moreover,pay subsidy 60USD/day until Installation finished.
If problems happened out of warranty and need debugging overseas
Customer should pay for all the charges (including food,lodging and round trip air tickets etc.)
Moreover pay 100USD/day till install finished
Contact Person: Andy Yang
Tel: +8613921262246